EH-0200 Inverter
6 min
description eh0200 inf 01 v3 brochure for grid inverter overview /#overview the eh 0200 inverter is an energy storage bidirectional power conversion system designed for the bidirectional energy conversion between batteries and the grid ac power its main component is an inverter composed of power electronic components with embedded control software three level topology, up to 99% conversion efficiency, better power quality integrated cluster level battery management function, high battery availability intelligent multi stage fan speed regulation, wide temperature operation capacity, up to 45 °c no derating support constant power, constant current, constant voltage control, with a frequency modulation, vsg, and other functions support iec61850 protocol, with millisecond level responsiveness ip66 protection, outdoor use electrical diagram /#electrical diagram specifications /#specifications battery side dc max dc voltage 1,500vdc max dc current 224 5adc battery system voltage range 1,000 1,500vdc grid side ac rated power 200kw max ac power 220kw rated grid voltage 690vac, 3w+pe grid voltage range 586 5 759v(settable) max ac current 184 1aac rated grid frequency 50/60hz harmonic (thdi) <1 5% (100% load) ac power factor 1 +1 general isolated no max efficiency 99% ip protection ip66 operation temperature 40 +60°c allowable humidity range 0 100% (no condensation) maximum operating altitude 4,000m cooling temperature controlled forced air cooling communication interface rs485/can/ethernet dimensions(wxdxh) 810×275×845mm weight 100kg proven performance /#proven performance our inverters are based on a proven design from one of the world’s largest solar inverter manufacturers they are fully certified by tuv according to fingrid class a to class d for use in installation from 1mw to above 30mw and for 110kv grid connections and support all frequency regulation modes as well as grid forming where required the inverters have also been fully tested according to elering requirements for class a to class d installations response time /#response time from the time of issuance of a modbus power command to our bess container controller, it takes the inverters between 150ms and 300ms to reach the required power as measured by external fast meter this includes power commands from maximal charge power to maximum discharge power faster response time are possible via optimization suppliers the eh 200 ha m grid inverter is manufactured by sineng electric co it is also contract manufactured under licence by our joint venture partner and contract manufacturer cubenergy this arrangement gives us dual sourcing capabilities {% file src=" gitbook/assets/eh0215ham brochure sineng pdf" %}